SELECT wp_posts.* FROM wp_posts WHERE 1=1 AND (wp_posts.ID = '11338') AND wp_posts.post_type = 'cpt_11179' ORDER BY wp_posts.menu_order, wp_posts.post_date DESC

Integrated Design Process (IDP) Charrette

Many factors contribute to energy consumption in a building. And many stakeholders are involved in the design and construction of a building. To design a high energy-performance and thermally comfortable building, all the factors must be considered; and all the stakeholders must be on-board.
The integrated design charrette of BEEP is an interactive workshop, held over four days, which brings together the building design team and senior Swiss experts to develop the energy concept of a building during the early phase of building design.
Learn more about the BEEP Integrated Design Charrette in this video.