Name of the project: Smart GHAR III, Rajkot
Developer: Rajkot Municipal Corporation
Location: Rajkot
Climate Zone: Composite
Total Built-up area: 57,408 m2 (1176 flats:1 BHK)
Outcome of charrette:

  • Improved thermal comfort
  • Peak temperatures reduced by ~5OC in bedrooms.
  • Inside temperature will be equal or below 30°C for ~70% of the year, instead of 30% in the original design.

Charrette conducted in September 2016